Project Management Stages: The 5 Phases of a Project and What Each One Must Deliver

SHORT ANSWER

A project passes through four life cycle stages: initiation, planning, execution and closing. Project management adds a fifth group of work, monitoring and controlling, which runs alongside execution rather than after it. That is why you see both “four phases” and “five phases”. Each stage ends with a gate: a check that the stage delivered what it had to before the project moves on.

Course on this topic: Project Management Course: PMI PMBOK 7 Training

I have worked on projects at a TV channel where every show has a fixed air date, at a game developer opening new offices, and at a bank rolling out new systems. The projects that hurt most rarely had a bad idea. They skipped a stage: started without a plan, or never really ended.
Below: the stages of a project in the order they happen, what each one must deliver, how to decide that a stage is done, an example you can copy, and the mistakes I see most often. To check your own project right now, go to the phase gate checklist.

What are the stages of project management?

A project life cycle is the series of phases a project passes through from initiation to completion. A phase is a set of logically related activities that ends with one or more outputs. In my course I use four stages:
  1. Initiation — is this project worth doing at all?
  2. Planning (organization and preparation) — how exactly will we do it?
  3. Execution — build the team and do the work.
  4. Closing — accept the result, release the people, learn.
Project management itself is described by five process groups: initiating, planning, executing, monitoring and controlling, and closing. The fifth one is not a separate period in the calendar. It starts with the first task and lasts until closing: compare the results with the plan, deal with problems, keep everyone informed. So when one guide says “four phases” and another says “five phases”, both are right. One counts stages in time; the other counts kinds of work. For a small project all four stages can take just a few days, but the sequence stays.

Stage 1. Initiation: should we do it, and can we do it?

Every project begins with an idea or a need. Sometimes initiation is informal: a short discussion and a verbal agreement. But two questions have to be answered either way:
  • Should we do it? Are the benefits worth the costs? Is there a better way to solve the problem?
  • Can we do it? Is it technically feasible? Do we have the resources?
The tools for those answers are a cost-benefit analysis (all expected benefits against all costs of doing the project and supporting the change it brings) and a feasibility study. The result of the stage is a decision to move on, plus the project charter: purpose, measurable objectives and success criteria, high-level requirements and boundaries, overall risk, a short milestone schedule, pre-approved money, key stakeholders, exit criteria, the project manager with their authority, and the sponsor who approves it all.
FROM MY PRACTICE · WARGAMING

When I worked at Wargaming, we did this kind of analysis before expanding. We were considering opening a customer support center in another city.

We looked at what rent costs there, what the salaries are, how many specialists there are, which universities train them and whom exactly they train, what vacancies are open and which companies already work there. We analyzed all of it, and then we dropped the idea.

Initiation is allowed to end with a “no”. A project stopped after a week of analysis is a success of the first stage, not a failure of the project.

— Mike Pritula

Stage 2. Planning: what goes into a project plan

Planning turns the charter into a document that says how the project will be done. My checklist for a project plan:
  • why the project exists and a detailed description of the expected outcomes;
  • all constraints and all assumptions;
  • all tasks, broken down, and who plays which role;
  • a detailed schedule;
  • people, money and other resources: equipment, facilities, information;
  • how you will manage the major risks and uncertainties;
  • a communication plan and a quality assurance plan.
Add one more line that almost nobody adds: the closing activities. If you start thinking about closure only when the work is done, it is too late to collect the information and the resources you need. Who assigns roles inside the team is a separate question; a RACI matrix answers it on one page.
Very large projects are hard to plan in full detail up front. For them I use rolling-wave planning: break the first three months into pieces of two weeks or less, plan the rest in packages of one to two months, and every three months detail the next block.

Stage 3. Execution: preparation first, then the work

Execution does not start with tasks. It starts with a short preparation step that teams like to skip:
  • assign people to every project role;
  • introduce the team members to each other and to the project;
  • give and explain the tasks to everyone;
  • agree how the team will perform its core functions;
  • set up the tracking systems;
  • announce the project inside the organization.
Only then comes the work itself: carrying out the tasks, quality assurance, managing and developing the team, sharing information. The outputs of this stage are the deliverables, progress reports and other communications.

Monitoring and controlling: the phase that runs alongside execution

Monitoring and controlling is three habits, repeated every week: compare performance with the plan, deal with the issues that come up, keep everyone informed. The simplest format I know is a regular team meeting in three parts: progress, plan, problems. What we did, what we do next, what stops us. For a specific issue, call a separate meeting with everyone affected and record each action with an owner.
Monitoring also protects the date. I prefer to release on the date we set at the start, because in my experience everyone takes a slipped deadline very badly.
FROM MY PRACTICE · WARGAMING

At Wargaming I was a member of the project team launching a new performance management process, performance review. And the launch dragged on badly. We struggled with it for a very long time, because we tried to make it perfect.

Instead of rolling out something basic and then bringing it to perfection with new releases, the team got stuck trying to make everything perfect at once.

The flexible deadline exists as an approach, but I am not a supporter of it and I do not recommend it to you. Ship the basic version on time and improve it in releases.

— Mike Pritula

Stage 4. Closing: the stage most projects skip

Ending is what makes a project a project. Yet when you are pulled into the next assignment, the finished project lingers and fades away. Then you never learn whether it was conceived, planned and run well, and the team never feels the work was finished.
A closing checklist I use:
  • finish all open activities and all required deliverables;
  • get formal approval and sign-off on the results, including from the customer — a signature or written confirmation, not a thumbs-up in a chat;
  • resolve disputes with vendors, pay all bills, close contracts;
  • close the project accounts so that no time or money can be charged to them later;
  • acknowledge each person’s contribution, thank them, help them move to their next assignment;
  • announce to the organization that the project is complete;
  • hold a lessons learned review and archive the documents.
At the lessons learned meeting ask: Did we achieve all the goals? Did we meet the schedule and the budget? Could we have foreseen the problems? Did we handle them well when they came? Leave with two lists: practices to repeat and practices to avoid, each with next steps. Collect lessons during the whole project, one line each time something surprises you; the meeting only puts them together.
Two more rules from my certification-prep course. Plan closing at about 5% of the project time — on a four-month project that is a week. And a cancelled project is closed the same way: accept what exists, report, record the lessons, release the people, archive. The next project manager needs to know what was built and why it stopped.
FREE TOOL

Phase gate checklist

Pick the gate your project is at and tick what is really done. Items marked ★ are must-haves: without them the project does not move on.

The full version, with the project charter template, the project plan checklist, the communication plan and the lessons learned questions, is in the Project Management Course: PMI PMBOK 7 Training.

Phase gates: how to decide a project can move to the next stage

A phase gate is the last step of a stage. The project is checked against agreed criteria, and only projects that meet them move on. If one or more criteria are not met, there are two options: keep the project in the current stage and bring the weak points to an acceptable level, or cancel it. There is no third option called “let’s just start and see”.
The checklist above follows that rule: a missing ★ item means “not ready”; other open items can pass the gate with an owner and a date.

Do the stages change for agile and hybrid projects?

The stages stay; their rhythm changes. In a predictive life cycle scope, schedule and cost are fixed early and any change goes through change control: plan, build, test, deliver, one release at the end. In an adaptive life cycle the team works in iterations of one to four weeks: build a small working piece, show it to the customer, learn, repeat. A hybrid keeps a predictive skeleton — fixed milestones and budget — with iterations inside. In large companies most projects are hybrid, even if nobody calls them that.
Five yes-or-no questions pick the life cycle: Are the requirements clear today? Is change expensive? Is the work regulated? Is it a fixed-price contract? Can the customer give feedback every few weeks? Yes to the first four — predictive. No to the first two and yes to the fifth — adaptive. Mixed answers — hybrid. More on the mindset behind it in my article on building an agile culture.
FROM MY PRACTICE · ALFA-BANK

When I worked at Alfa-Bank, the bank was implementing a new core banking system. The project was planned for several years. I do not know all the details, but in the four and a half years I worked at the bank I did not see any visible result.

I know that after I left there was nothing for a long time too. The first results came out about eight years after the start, and they were not great: errors, bugs. As far as I know, the project was wound down, though I may be wrong.

Without planned quick results, even a large project that is moving technically loses people’s faith and can fade out.

— Mike Pritula

Project stages example: an office move

I know cases where HR led the renovation of a new office and the whole move. Take the example from my course: moving 200 people. Clear requirements, a signed lease, fire safety rules, a fixed-price moving company, and you cannot move half the people and ask how they like it — a predictive project. Its stages:
  • Initiation: why we move, costs against benefits, the charter with the sponsor, the budget and the target date.
  • Planning: who moves where and when, the task list and schedule, the vendor contract, risks such as a delay in the building works, the communication plan for employees.
  • Execution and control: the team and roles, an announcement to the company, weekly “progress, plan, problems” meetings against the schedule.
  • Closing: sign-off on the new office, contracts closed and invoices paid, thanks to the team, a lessons learned review for the next move.

Common mistakes at each stage of a project

  1. Skipping “should we do it?” Nobody compares benefits with costs.
  2. Starting work before the plan exists. Monitoring then has nothing to compare with.
  3. Planning a huge project in full detail up front instead of in rolling waves.
  4. Polishing instead of releasing on the agreed date.
  5. No visible results for months. People stop believing first.
  6. Letting the project fade instead of closing it.
  7. Passing a gate with must-haves missing.
If you want to build all of this into your own work — the charter, stakeholders, scope, schedule, resources, team, control and closing — it is the structure of my Project Management Course: PMI PMBOK 7 Training, ten lessons that follow a project from the first idea to closing, with the templates I use.
FAQ

Frequently asked questions

What are the stages of project management?

Initiation, planning, execution and closing are the four stages of the project life cycle. Monitoring and controlling is the fifth group of project management work; it runs in parallel with execution and compares what is happening with the plan.

Is monitoring and controlling a separate phase?

Not in time. It is a group of processes that starts as soon as work starts and lasts until closing: compare results with the plan, deal with issues, keep everyone informed. Many guides list it as a fifth phase for convenience.

What is a phase gate in project management?

A phase gate is the decision point at the end of a stage. The project moves on only if it meets the agreed criteria; if it does not, it either stays in the current stage until the gaps are fixed or it is cancelled.

Which project phase is most often skipped?

Closing. Teams get pulled into the next assignment and the project fades away without formal acceptance, closed contracts or a lessons learned review, so nobody can say whether it was planned and run well.

Do agile projects have the same stages?

An agile project is still started, planned, run and closed, but planning and delivery repeat in short iterations of one to four weeks instead of happening once. Many projects are hybrid: fixed milestones and budget on top, iterations inside.